NEW QUESTION # 52
How can you update the degree of processing for an activity?

  • A. By scheduling the activity
  • B. By confirming the activity
  • C. By changing the activity
  • D. By using results analysis

Answer: B


NEW QUESTION # 53
Which of the following apply to dynamic item processor (DIP)? Note: There are 3 correct Answers to this question.

  • A. DIP is used to create a quotation.
  • B. Sources can be based on line items.
  • C. Sales prices are maintained in the DIP profile.
  • D. Usage of cost elements is mandatory.
  • E. Material determination is mandatory.

Answer: A,B,C


NEW QUESTION # 54
An external component is assigned to a network activity. The delivery date for the purchase requisition depends on the dates of the network activity. What controls whether the delivery date is defined by the earliest or latest scheduled dates?

  • A. The scheduling parameters for the network
  • B. The control key
  • C. The network profile
  • D. The table of MRP controllers

Answer: A


NEW QUESTION # 55
Project Structure
You plan double the work on each internal activity for multiple project. What do you recommend?

  • A. Double the work of each internal activity, one after another, in the project Builder.
  • B. Use mass change (CNMASS) in the project system.
  • C. Use mass change within the project Builder (CJ20N).
  • D. Double the capacity in the work center.

Answer: B


NEW QUESTION # 56
Project Structures
Which the following statement regarding networks are correct?.
Note : there are 3 correct answers for this question.

  • A. Capacity requirements of a network activity are reduced when the activity is confirmed.
  • B. You can assign more than one activity element to a network activity.
  • C. You can assign the same work center to more than one activity on the same network.
  • D. If a network activity requires more capacity than available in a work center, the system automatically proposes an alternative work center.
  • E. During scheduling, the system plans the network activities in such a way that the assigned work center are not overloaded in terms of capacity.

Answer: A,B,C


NEW QUESTION # 57
A customer needs to analyse the capacity requirements of their network activities. Which reports do you recommend? Note: There are 2 correct Answers to this question.

  • A. Structure information system reports
  • B. Cost element reports
  • C. Hierarchical reports
  • D. Resource reports

Answer: A


NEW QUESTION # 58
For which objects can billing plans be created? Note: There are 2 correct Answers to this question.

  • A. Sales order items
  • B. Milestones
  • C. WBS elements
  • D. Project definition

Answer: A,C


NEW QUESTION # 59
You want to determine the planned costs for an internally processed activity. Which data do you need Note: There are 2 correct answers to this question

  • A. Work
  • B. Profit center
  • C. Activity type
  • D. Duration

Answer: A,D


NEW QUESTION # 60
You use a WBS project structure with network and maintenance order. You want to schedule both the network and the maintenance order .
What do you have to consider?

  • A. The maintenance order s must be assigned to the same budget profile as the project definition.
  • B. The maintenance orders must be assigned as sub-networks.
  • C. The maintenance orders must be assigned to WBS element.
  • D. The maintenance orders must be assigned to the same plant as the network.

Answer: D


NEW QUESTION # 61
Project Structure
Your customer has implemented budgeting for projects. The current budget of their projects has been changed several times. Therefore they want to get an overviews of the budget updates.
What standard report do you recommend?

  • A. Line item report for budget
  • B. Hierarchical report on budget updates.
  • C. Cost element report on budget updates.
  • D. Structure overviews for budget.

Answer: B


NEW QUESTION # 62
Which statements describe planned and actual revenue for WBS elements? Note: There are 2 correct Answers to this question.

  • A. Planned revenue can be transferred from a sales quotation.
  • B. Actual revenue is posted via a billing document created from a sales order
  • C. Actual revenue is posted via a billing plan assigned to a WBS element.
  • D. Planned revenue requires a sales order assigned to a WBS element.

Answer: A,B


NEW QUESTION # 63
Dates
You want to exchange data between SAP Project System and Microsoft What interface do you use?

  • A. you do not need and interface. You can exchange data using object link.
  • B. The catalog interface.
  • C. No interface to Microsoft Project is available.
  • D. The EPS interface (External Project Software).

Answer: D


NEW QUESTION # 64
What are some of the possible functions in user status profiles? Note: There are 2 correct Answers to this question.

  • A. Ensure user status must always be set manually.
  • B. Restrict setting user status for individual users.
  • C. Allow business processes forbidden by SAP system status.
  • D. Utilize priorities for setting the user status.

Answer: B,D


NEW QUESTION # 65
A customer project must be finished at a given due date. The project consists of WBS elements and networks. What scheduling type do you use?

  • A. Only capacity requirements
  • B. Forward
  • C. Backward
  • D. Current date

Answer: C


NEW QUESTION # 66
A customer needs to analyze the capacity requirements of their network activities. Which reports do you recommend? Note: There are 2 correct answers to this question

  • A. Structure information system reports
  • B. Cost element reports
  • C. Hierarchical reports
  • D. Resource reports

Answer: A,D


NEW QUESTION # 67
Float time is calculated during scheduling.
Which of the following statements about float time are correct?
Note: There are 3 correct answers to this question

  • A. The float time of WBS elements is calculated by extrapolation
  • B. The maximum size of a free float is as large as the total float of an activity
  • C. Float time can be negative
  • D. By default, critical activities have a float time, which is less than or equal to zero
  • E. Activities with the time constraint "Must start on" always have a negative float time

Answer: B,C,E


NEW QUESTION # 68
Project Structures
You are using assembly processing. You need to determine the delivery date of a sales order item with an account assignment to the project.
What are the prerequisites?
Note: There are 3 correct answers to this question

  • A. A material master with sales views
  • B. Standard network with activities
  • C. Assignment between material and standard network
  • D. A bill of material with sales views
  • E. A production order

Answer: A,B,C


NEW QUESTION # 69
A component is assigned to a network activity. What are the prerequisites to generate project stock reservations? Note: There are 3 correct answers to this question

  • A. The network activity is assigned to a WBS element
  • B. The network is assigned to a sales order item
  • C. The Project Stock indicator is set in the project definition (non-valuated or valuated)
  • D. The material master of the component must permit project stock management
  • E. A procurement indicator must be assigned to the activity

Answer: A,C,D


NEW QUESTION # 70
......